Understanding
the Typical Road Construction Process
Roads play an essential role in the economy and productivity. When planning new ones, local authorities consider several factors. These include lowering travel time, reducing traffic, improving commutes, reducing accidents, and improving the quality of life in built-up areas by reducing noise and air pollution.
Typical road construction requires four phases: planning, setting out, earthworks, and road surfacing.
The planning process requires consultations with stakeholders and the public, feasibility studies, meeting planning procedures, and creating cost estimates. Once the planning process is completed, surfacing contractors enter a tendering process. The construction process can begin with the award of the tender.
Using the profile board method, the land surveyor places boards indicating the required construction level along the proposed road lines. These boards are precisely a meter above the desired level for the completed roads, ensuring all works, including excavation, remain within the design limits.
Roadworks contractors know that the earthworks phase is critical to the typical road construction process because it lays the foundation for a problem-free road. It entails several stages:
- Removal of vegetation and topsoil
- Creating embankments with cuts and fills
- Filling dips and levelling bumps in the screened dirt with a grader or bulldozer for a better foundation
- Spraying the screened dirt with water and compacting it completely
- At this point of the road surfacing, the surfacing contractors build in crucial drainage elements that help increase the tarmac life expectancy – installation of sewers and drains and ensuring a higher centre in the road to accommodate water runoff
Paving Phase
The typical road construction process in the UK usually entails using asphalt or concrete, or a combination of the two, based on expected traffic and costs. During this stage, several courses are laid to create a road based on the specifications required.
Asphalt Paving
Asphalt contains bitumen, a petroleum-based substance that holds together the sand and crushed stones. The asphalt arrives at the road surfacing site and has already been heated to around 150°C, ready to spread and compact onto the compacted foundation.
Concrete Paving
The mixture contains sand and crushed rock, like asphalt paving, but cement holds them together. Road contractors pour the liquid concrete into forms (steel moulds). Before it dries, a finishing machine uses vibrating movements to ensure it settles evenly. Joints between each concrete slab help prevent cracks on the road surface by allowing for expansion and contraction during temperature changes.
Whatever the enquiry we can provide assistance with:
Asphalt Laying
Resurfacing
MUGA
Hard Standings
Paths
Private Roads
Car Parks
Playgrounds
The first impression of a business is vital, and we fully understand the visual impact this will have on your company. We bear this in mind when creating a new car park, relaying a worn one, lining parking bays or providing a service that is one of the first things your client observes about your business.
With our own fleet of vehicles, equipment and manpower, we can provide a thoroughly effective and efficient service for your needs.
SEE HOW WE CAN HELP WITH YOUR NEXT TARMAC PROJECT!
Why Choose us?
Established since 1952
Own operated plant
Serving the West Midlands and surrounding areas
High Quality Service
Council & Local Authority approved contractors
Reliable, trusted & affordable
Fully qualified staff
Peace of mind Guarantee
© Copyright 2018
All Rights Reserved
Company No: 3597 625
VAT Reg 273 5334 57
CONTACT US
FOLLOW US